- Offices
- Industrial
- Housing
- Fort St. Housing
- Twechar Canal Housing
- Mugdock Road Housing
- Waverley Park
- 23 flats at Chryston
- Fire Station Field
- Duntiglennan Farm
- Private houses
- Moor Road Strathblane
- Rubislaw Drive, Project 1, Bearsden
- Boclair Crescent, Bearsden
- Mugdock Road, Milngavie
- Rubislaw Drive, Project 2, Bearsden
- Buchanan Drive, Bearsden
- Chapelton Avenue, Bearsden
- The Toll House, Aberfoyle
- Randolph Road, Glasgow
- Hillfoot Drive, Bearsden
- Kirkland House, Clachan of Campsie
- Thorn Road, Bearsden
- Kelvin Crescent, Bearsden
- The Retreat, Strachur
- South Erskine Park, Bearsden
- Coach House, Bearsden
- Coach House Conversion, Crieff
- Clachan of Campsie
- Churchill Drive, Glasgow
- Leisure
- Religious
- Health
- Regeneration
- Conservation
- Sustainability
Allander Surgery, Glasgow
The building is planned in 3 zones:- patients & staff; patients; and staff. The building has been designed with the patients at the centre of the building with the waiting area located in the centre of the building, thus cutting down travel time from waiting area to consulting rooms. It is one and half storeys high here with high level glazing. Natural light streams in from top windows which run along the reception wall throwing sunlight onto the adjacent walls. Circulation is obvious so patients can orientate themselves easily around the building. Reducing circulation to 12.5% (32% allowed) allowed more space for working at the records area and a more spacious meeting room without adding to the cost. A calm building through the use of colour, texture, form and healthy materials promoting a comfortable healing environment. This building is low maintenance, flexible enough to allow for future change and is sustainable through enhanced insulation in walls and roof.
- Login to post comments